FLARING WORK AND CONNECTION OF PIPING
ENGLISH
Preparation of Piping
- Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the follow-
ing procedure.
- Use the de-oxidised copper as piping materials to install.
Cut the pipes and the cable
- Use the piping kit accessory or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5m longer than the pipe
length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe in a
downward direction as you remove burrs in
order to avoid dropping burrs into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after flaring
work)
Flaring work
- Carry out flaring work using dedicated flaring
tool for R32 as shown below.
Firmly hold copper tube in a bar(or clamp) as
indicated dimension in the table above.
Copper
tube
90°
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Outside diameter
Temper grade A
mm inch Annealed (O) mm
Ø6.35 1/4 Annealed (O) 1.1~1.3
Ø9.52 3/8 Annealed (O) 1.5~1.7
Ø12.7 1/2 Annealed (O) 1.6~1.8
Ø15.88 5/8 Annealed (O) 1.6~1.8
FLARING WORK AND CONNECTION OF PIP-
ING
1,MFL68883815,영영 17. 12. 16. 영영 9:57 Page 18
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 42 43

Comments to this Manuals

No comments