Installation
12 Indoor Unit
1. Remove the Air Filter.
2. Check the drainage.
• Spray one or two glasses of water upon
the evaporator.
• Ensure that water flows drain hose of
indoor unit without any leakage.
Checking the Drainage
INSULATION, OTHERS
Insulate the joint and tubes completely.
All thermal insulation must comply with local requirement.
INDOOR UNIT
n After all workings are finished, check the working and operation.
• Air distribution ....... Is the air circulation good?
• Drain ..................... Is the drainage smoothly and no sweating?
• Gas leakage ........ Is the piping connection correctly?
• Wiring ................... Is the wiring connection correctly?
• Lock-bolt ............... Is the lock-bolt of compressor loosened?
• Insulation .............. Is the unit fully insulated?
• Ground..................Is the unit safely grounded?
THERMAL INSULATION
Make sure that there is no clearance here.
insulator for piping.
Comments to this Manuals