LG ARNU15GQAA2.ENWALEU User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Flaring Work
Main cause for gas leakage is due to defect of flaring work. Carry out correct flaring work in the following proce-
dure.
Cut the pipes and the cable.
1. Use the piping kit accessory or the pipes purchased
locally.
2. Measure the distance between the indoor and the out-
door unit.
3. Cut the pipes a little longer than measured distance.
4. Cut the cable 1.5m longer than the pipe length.
Burrs removal
1. Completely remove all burrs from the cut cross section
of pipe/tube.
2. While removing burrs put the end of the copper
tube/pipe in a downward direction while removing
burrs location is also changed in order to avoid drop-
ping burrs into the tubing.
Putting nut on
• Remove flare nuts attached to indoor and outdoor unit,
then put them on pipe/tube having completed burr
removal.
(not possible to put them on after finishing flare work)
Flaring work
1. Firmly hold copper pipe in a bar with the dimension
shown in below table table below.
2. Carry out flaring work with the flaring tool.
Copper
pipe
90
Slanted Uneven Rough
Pipe
Reamer
Point down
Flare nut
Copper tube
mm inch mm
Ø6.35 1/4 1.1~1.3
Ø9.52 3/8 1.5~1.7
Ø12.7 1/2 1.6~1.8
Ø15.88 5/8 1.6~1.8
Ø19.05 3/4 1.9~2.1
Outside diameter A
Bar
Copper pipe
Clamp handle
Red arrow mark
Cone
Yoke
Handle
Bar
"A"
Installation
14 Indoor Unit
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 26 27

Comments to this Manuals

No comments