
68
ENGLISH
Using the Program
3. Select an ACP group to see its control status.
• You can check the demand control status in the control information display and the operation
status list.
NOTES
y
Depending on the installation site specifications, either of the peak control and demand control can
be selected. Go to Set > System setting > Basic setting. In Select peak/demand controll select
a desired control method.
y
You can check the demand control status and edit groups in the demand control menu. But you can
not set the target operation rate, switchover, Activity Controls, and Apply All/Disable All.
Comments to this Manuals