LG MU3M21.UE0R0 User Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 37
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
Checking the Drainage, Forming the Pipings and Long Pipe Setting
Installation Manual 27
ENGLISH
Long Pipe Setting
1. Open the top cover of outdoor unit.
2. Select one of the two selectable modes as
follows.
3. Set the Zone as shown in Fig.
4. Close the top cover and check whether the
product works normally.
*A7UW406FA2[FM40AH]) is not available.
WARNING: Do not open the top
cover or Set the pipe length
when operating the product.
NORMAL
LONG
Pipe length
14kBtu/h, 16kBtu/h
1
SW01N
234
18kBtu/h, 21kBtu/h, 24kBtu/h
27kBtu/h, 30kBtu/h
ON
1234
5
ON
1234
5
1Ø: 40kBtu/h, 48kBtu/h, 56kBtu/h
3Ø : 42kBtu/h, 48kBtu/h, 54kBtu/h
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 36 37

Comments to this Manuals

No comments