Connecting Pipes
Connecting Pipes
Preparation of Piping
Main cause of gas leakage is defect in flaring
work. Carry out correct flaring work in the fol-
lowing procedure.
Cut the pipes and the cable.
• Use the accessory piping kit or the pipes
purchased locally.
• Measure the distance between the indoor
and the outdoor unit.
• Cut the pipes a little longer than measured
distance.
•
Cut the cable 1.5m longer than the pipe
length.
Burrs removal
• Completely remove all burrs from the cut
cross section of pipe/tube.
•
Put the end of the copper tube/pipe to down-
ward direction as you remove burrs in order to
avoid to let burrs drop in the tubing.
Putting nut on
• Remove flare nuts attached to indoor and
outdoor units, than put them on pipe/tube
having completed burr removal.
(Not possible to put them on after flaring work)
Flaring work
•
Carry out flaring work using dedicated flar-
ing tool for R-410A as shown below.
Firmly hold copper tube in a bar(or die) as
indicated dimension in the table above.
Check
• Compare the flared work with figure below.
• If flare is noted to be defective, cut off the
flared section and do flaring work again.
Outside diameter "A"
mm inch mm
Ø6,35 1/4 1,1~1,3
Ø9,52 3/8 1,5~1,7
Ø12,7 1/2 1,6~1,8
Ø15,88 5/8 1,6~1,8
Installation Manual 11